the incN lifecycle

What an increment is, how one runs start-to-finish, and how the numbers are assigned. The vocabulary (inc-4/inc-5/inc-6) is load-bearing across CONTEXT.md and paths/PATH-*.md but was never defined — this is the definition. Companion to development-lifecycle.md (the whole-project frame); an inc is the unit that frame's CONSTRUCTION/INTEGRATION phases run on.

What an inc is

◊ checkpoint  ── a stable architectural pose (ROADMAP.md ◊1…◊6)
   └─ inc-N    ── ONE proof/work unit advancing toward that pose
        ├─ scoped by a   paths/PATH-*.md   (the gated statement + unit plan)
        ├─ usually on its own  worktree + branch  (incN-slug)
        └─ a sequence of commits at clean seams

An inc is NOT a branch, a commit, or a proof on its own — it is the unit of work between two stable poses, of which those are the artifacts. One inc typically spans several sessions and a handful of commits.

Concretely, the current reshape's increments each got a worktree+branch (one writer per tree — parallel-agent-writes-need-worktrees):

incscopebranch / worktree
inc-5LR / Compat re-index → Modelinc5-comp-grind, inc5-lr-reindex
inc-6CalcVM route-B re-derivationinc6-u3-bridge

A long inc decomposes further into units (U1, U2, …) inside its PATH — leaf-first, each a clean seam to commit and resume at (see PATH-inc6 §3).

Lifecycle of one increment

  SCOPED ──► DE-RISKED ──► GROUND ──► DONE ──► MERGED
    │           │            │         │         │
  PATH +     refute-first  multi-    green     to the
  gated      probe: the    session,  seam +    reshape
  statement  statement is  commit    axiom-    trunk
  (frozen)   guilty until  at clean  clean     (then main)
             proven true   seams     gate
stagewhat happensevidence it is real
scopedwrite PATH-*.md: the frozen statement, unit plan, wall-riskthe PATH exists + names the gated theorem
de-riskedrefute-first — try to break the statement before investing; a machine-checked False is a first-class deliverable (e.g. ADR-0056 found the inc-5 diagonal FALSE)a green de-risk probe / a refuted alternative
groundturn opaques → defs, discharge sorrys, across sessions; commit at every clean seam (the build arbitrates the def shape — invariant #4)commits banked at green frontiers
donethe gated statement closes on a green seam with an axiom-clean gate#print axioms ⊆ {propext, Classical.choice, Quot.sound}
mergedthe worktree's branch folds into the reshape trunk; the ◊ advancesthe branch is in the trunk's history

Done = green seam + axiom-clean gate — never a summary, never a quiet tree. Gate the committed content (gate-committed-content-not-worktree), via the axiom set, never grep sorry (gate-sorries-via-axioms-not-grep).

Numbering

Sequential within the ADR-0045 typed-static reshape (the trunk is typed-static-r1 for docs/design; proof branches fold into it, then to main). Each inc re-keys one layer of the stack to the new identity-dispatch AST:

inc-4   AST + soundness     metatheory: preservation/progress over the new AST
inc-5   LR / Compat         logical-relation + Compat re-index → Model (the diagonal)
inc-6   CalcVM route-B      re-derive evalD cap-keyed (the Bahr–Hutton calculation)
inc-7   Surface / NamedCore elaborator re-key (the frontend edge)

The numbers are a re-key order, leaf-toward-apex: the kernel AST (inc-4) must settle before the LR over it (inc-5), before the calculated VM (inc-6), before the surface that targets it (inc-7). They are not freely parallel — Spec greens only when inc-5 AND inc-6 both land; Audit also needs inc-7.

Where an inc sits among the docs

elementhome
the increment's gated statement + unit planpaths/PATH-incN-*.md
current increment + what's leftCONTEXT.md (the lead ★ section)
the checkpoint it advancesROADMAP.md (◊)
a decision the increment forcedan ADR in docs/decisions/
the whole-project phase framedocs/notes/development-lifecycle.md